IJSRP, Volume 9, Issue 3, March 2019 Edition [ISSN 2250-3153]
Khawar Jalil, Shahid Raza
Abstract:
One of the reasons mining projects are facing sudden closure and premature termination is the financial uncertainties associated with these project. Mining projects differ from each other e.g. on the basis of utilized human and technological resources. This paper has two objectives, first is to estimate different cost components as percentage of the total cost and second is to propose an optimum cost model each for the bench drilling phase of granite mining through diamond wire sawing technique.