Abstract:
This paper aims to identify the legal, accounting, and tax issues faced by PT ABC in selecting one of the three partnership schemes for conducting the geothermal power plant project in Area X. The first scheme is PT ABC sign a Joint Operation Contract with AP-PLN to conduct the total project where PT ABC are responsible to develop the upstream side while AP-PLN are responsible to develop the downstream side.
Reference this Research Paper (copy & paste below code):
Jenny Kanprilla, Ning Rahayu
(2022); The Analysis of Legal, Accounting, and Tax Issues in Selecting Partnership Scheme for The Geothermal Power Plant Project (Case Study of PT ABC); International Journal of Scientific and Research Publications (IJSRP)
12(1) (ISSN: 2250-3153), DOI: http://dx.doi.org/10.29322/IJSRP.12.01.2022.p12152