IJSRP, Volume 6, Issue 8, August 2016 Edition [ISSN 2250-3153]
Ali Aliyuda and Muhammed Kabir Ahmed
Abstract:
In this Paper, a Multi-agent System platform that will allow agents to detect and report fault in Power Distribution System (PDS) with the minimum time delay is presented. Multi-agent System Engineering (MaSE) methodology was used to demonstrate how agents will be able to manage the complexity of PDS. The simulation of the framework in MatLab/Simulink indicates that Multi-Agent System technology can be applied to detect and report fault in Power Distribution System with the minimum time delay.